Skip to main content

Further Use & Development

Emulate Carbon Footprint

The impacts of global warming are apparent worldwide, from snowy slopes to beach destinations.

Currently, CO2 concentration is double (400+ prikkompared to 2.6 million years of human existence. Densely populated cities, AQI is combining with precipitation, making the effects more toxic.

A True Digital Twin emulates operational & behavioural awareness to simulate, predict, & inform decisions based on real-world conditions.

All sustainability-related goals such as Net Zero, Net Carbon, ESG, and Decarbonisation can be reliably simulated with the Digital Twin.

With Digital Twins make every step count & improve…

6D BIM or studies for reducing carbon emissions starts from concept design

Passive interventions decrease the load requirements of active systems.

As countries aim to reduce CO2 emissions, Thermal Simulation, Energy Modeling and Computational Fluid Dynamics (CFD) become pertinent at scheme design stage for layout/volumetric studies.

Video showcasing CFD and thermal analysis.

Improved GUI

Two (2) aspects have a significant impact:

  1. Common Data Environment (CDE)
  2. 3D verification of progress and billing.

Various common platforms, such as BIM 360, Plannerly, Solibri, Revitzo, Trimble, etc., are available.

In essence, if the data is ‘ifc‘ compliant, it can transition between any BIM software, based on policies set for a project.

Intelligent Building Management Systems (IBMS) and Internet of Things (IoT) have evolved the most with regards to GUI for remote monitoring. predictive maintenance and AI/ML algorithms.

R&D Integrated Approach

55% invested in technology by construction industry, compared to other industries

Experience Centers are being setup to showcase five (5) other technologies.

These too can be simulated on Digital Twins to assess application:

  • (1) Sustainable Systems & Materials
  • (2) Prefab. Construction & Modularity
  • (3) Internet of Things [IOT]/IBMS
  • (4) Trade Tools incl. Robotics
  • (5) App-based Construction & Operations

Training for Voluminous Delivery

-23% negative productivity reference to 1990; manufacturing grew 2-3% y-o-y

With Digital Twins, cohesively understanding the built environment is more achievable. Fragmented expertise is known to cause delays in coordination, sequencing, billing and more….

Sector

  • Residential
  • Base-build IT
  • Healthcare
  • Institutional
  • Corp. Interiors
  • Retail+
  • Manufacturing
  • Hotels
  • Stake Holder Mgmt

Discipline

  • Architectural
  • Structural
  • Civil Finishes
  • HVAC
  • Electrical
  • Public Health
  • Fire-Fighting
  • Extra Low Voltage
  • Internal Finishes
  • Facade
  • External Works

Each Sector will cover details on each Discipline

Boothcamp Components:

  • ‘ifc’/Open BIM compliance
  • Redo Sample Portfolios
  • Model & Set Sheets
  • Quantify (QS) & Issue
  • Drawing & RFI Tracker
  • Common Data Environment

The three (3) prong mantra for implementation is:

  • (1) Command Centers
  • (2) Centers B-city offices and
  • (3) Add-on courses at Educational Institutes