Medical College / Institute
2023-24
596,000 sq. ft
Concept Design to Handover in 15 months.
Architect on the project has high-attention to—detail and has successfully delivered 5.5 million sq.ft. of institutional projects in Singapore. This projects includes cost-sensitive considerations, particularly due to the connection with a public hospital. Notably, 75% of the assets feature exposed ceilings, where services and facade are Intricately tied to the high-design approach. One building delivered using 100% Synchronous 3D; others using Geometric 3D.