Projects
2019, 586,000 sq. ft.excavation to first patient in 11 months.
2020 - continuing, 720,000 sq. ft. 16 hospitals delivered, faster & cheaper.
2023-2024, 596,000 sq. ft.Concept Design to Handover in 15 months.
2021, 65,000 sq. ft100% drawings delivered with Geometric 3D.
2023-24 1,296,000 sq. ft100% drawings, BOQ, BOM with Synchronous 3D.