Skip to main content

Part-list (BOM) is
co-generated; with
a plugin for BOQ

Part-list (BOM) is
co-generated; with
a plugin for BOQ

Part-list (BOM) is
co-generated; with
a plugin for BOQ

Organizational Experience

350
Million sq.ft.
1000
Projects

Experience with Digital Twins

7.2
Million sq.ft.
48
Projects

Structured Procurement

80% value delivered by subcontractors – labour centric; even with large EPCS

The most significant capex saving occurs by:

  • assigning packages to expert sub-contractors,
  • awarding works zone-wise for redundancy, and
  • maximising direct material purchases.

Problems:

  • Time-bound incentives & penalties,
  • Nominated Sub-contractor clause, and
  • Extra & new items only based on model.

Fail-safes:

  • Administrative effort of tendering, and
  • Coordinating through project delivery.

Advantages:

  • Easier technology deployment
  • Higher progress visibility, and
  • Lesser macro dependencies.

Structured Procurement

Geometric BIM

Components of a system are modelled independently for visual representation.

Choose from an exhaustive library of objects/families to meet requirements.

Clash detection done separately and retrospectively is cumbersome.

Manufacturing like workflow are at roots of BIM, hence the linear approach.

Changes required are a cumbersome process i.e. slower than 2D.

Synchronous BIM

Components are recognised as part of a system with hot/live connections.

The same object (parametric) is modified by changing properties.

Clash detection synchronous of the modelling process refer RHS/next page.

Standard systems & specifications enable co-generated and high-level detail.

Changes done auto update calculations, drawing annotations and BOM/BOQ variance.

Faster Development
  • BIM woes!
  • What has Changed?
  • Geometrie BIM I Workflow
  • Synchronous BIM | Workflow
  • Why Geometric BIM works better?
  • Load Node Considerations
  • Scan-to-BIM / Existing Assets

Test

hbsd jdbkje

This is custom heading element

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

I am text block. Click edit button to change this text.

This is custom heading element

I am text block. Click edit button to change this text.

test

testtest

test

testtest

test

testtest

test

testtest

Cancer Speciality Hospital

2019, 586,000 sq. ft.
excavation to first patient in 11 months.

Mother & Child Hospitals

2020 - continuing, 720,000 sq. ft.
16 hospitals delivered, faster & cheaper.

Medical College / Institute

2023-2024, 596,000 sq. ft.
Concept Design to Handover in 15 months.

Corporate Interiors

2021, 65,000 sq. ft
100% drawings delivered with Geometric 3D.

Convention / Science Centre

2023-24 1,296,000 sq. ft
100% drawings, BOQ, BOM with Synchronous 3D.