The Scope Paralysis
Virtual Contractor /
Assist Manager
Coordinated Shop Drawing
Digital Twins bridge most of these gaps
Bill of Materials [BOM]
31% Projects completed within budget
A no-escalation contract, requires high-quality documentation, from a comprehensive virtual model that leaves no details overlooked.
- Faster design
- 15-20%
- development
- Faster than 2D
- & more robust
- including changes / revisions
Faster design, development & more robust
15-20% Faster
than 2D including changes / revisions
Design changes are a constant, these are done faster with automatically updated drawing annotations and Quantity Survey (QS) differentials.
Part-list (BOM) is
co-generated; with
a plugin for BOQ
Time & Resources to Build
25% Projects completed within deadline
Construction is still labour-intensive; hence having an adequate workforce and maximising their productivity is crucial to meet deadlines.
Prefabrication modularity, as seen in China, has proven to significantly increase delivery speed. Refer Appendix, for an integrated Approach.
Note: Volumetric construction relies on heavy-duty cranes and cumbersome transportation. For reference, Singapore alone, has over 20 plants servicing this need.
The Gantt connected projection of
Material, Labour, Cashflow, & Billing:
is hard-wired to actuals from:
- Daily In/Out of Labour & Material
- Daily Progress Report (DPR)
- Billing too is marked on model.
Facility / Assets Management
As technical design practices, we have limited experience in asset operations, so there’s limited to showcase. Connecting the As-built (LOD 500) to billing ensures a robust foundation for ongoing asset operations. Additionally, Synchronous BIM has active system functions; hence a LIVE model is available for IBMS.
IBMS = Intelligent Building Management Systems
Facility Operations
- trend analysis,
- carbon footprint
- anomaly alarms,
- online workflow audits,
- passive optimisations,
- ML/Al applications etc
Asset Maximization
- placemaking,
- policies & SOPS.
- activate neighbor-hood,
- showcase break-thrutech.
- feedback loops/surveys etc
7D BIM i.e. Asset / Facility management.
As designers, specifying control logics and staying updated with them; goes beyond the functional Input / Output (1/0) Schedule for IBMS e.g